CPM Schedules That Keep Projects on Track

Critical Path Method scheduling across the full project lifecycle — from pre-construction baseline development through construction progress tracking to post-construction forensic delay analysis. Every schedule is built with proper logic relationships, realistic durations, resource awareness, and a clear critical path. All work delivered in MS Project (.mpp) or Primavera P6 (.xer) with supporting PDF reports and narratives.

5
Specialized Services
CPM
Critical Path Method
15-pt
Audit Checklist
.mpp/.xer
Native Formats

How It Works

Our scheduling process from start to finish.

1

Gather Project Data

Collect drawings, specifications, contract milestones, existing schedules (.mpp/.xer), and progress reports via Google Drive.

2

WBS Development

Build the Work Breakdown Structure organized by phase, area, or trade — aligned to your contract requirements and reporting needs.

3

Activity & Logic

Define activities with realistic durations, assign logic relationships (FS, SS, FF, SF), and identify constraints, lags, and leads.

4

Critical Path Analysis

Run CPM analysis to identify the critical path, near-critical activities, and float distribution. Optimize the logic network.

5

Resource & Cost Loading

Assign resources and/or cost loading where required — enabling earned value tracking and cash-flow projection.

6

Deliver & Report

Export native files (.mpp/.xer), PDF Gantt charts, and a narrative report explaining key assumptions and scheduling logic.

5 Specialized Services

Click any service to reveal methodology, tools used, and typical timeline.

The Exchange

What You Provide

Upload via Google Drive or your preferred platform

  • Existing schedule files (.mpp or .xer format)
  • Progress data, daily logs, and percent complete reports
  • Construction drawings and specifications (for baseline development)
  • Contract milestones, deadlines, and liquidated damages provisions
  • Correspondence and change order documentation (for forensic analysis)

What We Deliver

All deliverables shared via your Google Drive folder

  • Native schedule files (.mpp/.xer) with full logic and resource data
  • PDF Gantt charts and summary-level bar charts
  • Branded narrative reports with executive summaries
  • Variance analysis and milestone tracking dashboards
  • One revision round included in every engagement

Standards & Tools

Industry frameworks and professional software we work with.

AACE RP 29R-03CPM Best PracticesMS ProjectPrimavera P6ExcelPower BIBluebeam Revu

Applicable Project Types

ResidentialCommercialHospitalityHealthcareInstitutionalIndustrialData CenterInterior Fit-outMixed-UseRenovation

Ready for a Quote?

Get an instant quote in under 2 minutes, or book a discovery call. Starts from $250.